Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/com_ockelcomputers_www/wordpress/wp-includes/functions.php on line 6121
Upcoming Prototypes | Ockel Computers

Upcoming Prototypes

By Jesper — september 11th, 2017

Our founder and CEO Tim Haaksma packed his bags (again) directly after the IFA show to visit our technical partners overseas. He is overseeing the final stages of the production of our upcoming prototypes. The deadline is set to the 15th of September, so we can’t wait until next week!

In this prototype round, we are producing both the Ockel Sirius A and Sirius A Pro configurations, as well as all three color sets. Once we get our hands on the prototypes, we’re happy to share more details with you.

The SMT process of the upcoming prototypes is well underway. (SMT is a method for producing electronic circuits in which the components are mounted or placed directly onto the surface of PCBAs). Here’s a video Tim shot in our factory:

Categorieën

Recente berichten